аÄÃÅÁùºÏ²Ê¿ª½±½á¹û inaugurates its automotive cable factory in Morocco

аÄÃÅÁùºÏ²Ê¿ª½±½á¹û
Wednesday 24 January 2018
Inauguration in Tangier of the first аÄÃÅÁùºÏ²Ê¿ª½±½á¹û industrial site in Morocco.

As part of its recent international industrial development, аÄÃÅÁùºÏ²Ê¿ª½±½á¹û inaugurated its new factory specialised in automotive wiring on 24 January 2018 in Morocco. The site has been designed in accordance with the Group's standards of industrial and environmental excellence.

Acome Inauguration Maroc

The new automotive cable production site was inaugurated on 24 January 2018 in Tangier, Morocco, less than 18 months after the beginning of construction. The ceremony was attended by Mr. Othman El Ferdaous, the Moroccan Minister of Investment, Mr. Fouad Brini, President of TMSA, and Mr. Jacques de Heere, Chairman-Chief Executive Officer of аÄÃÅÁùºÏ²Ê¿ª½±½á¹û.

First automotive subsidiary in Africa

This new plant is аÄÃÅÁùºÏ²Ê¿ª½±½á¹û's first automotive sector subsidiary in Africa. Already operating in Africa through a Telecom subsidiary, аÄÃÅÁùºÏ²Ê¿ª½±½á¹û is strengthening its industrial proximity in a region that accounts for 25% of EMEA automotive cable production.

Focused on innovation, the Moroccan plant produces new wires and cables in the skinny wires (wires from 0.13mm² to 0.22mm² in copper alloy with PVC T2 and T3 insulation), PP and PVC T3 ranges. аÄÃÅÁùºÏ²Ê¿ª½±½á¹û is also exporting its technological know-how, represented by the XLPE T3 and XLPE T4 ranges, which are found at all the Group's production sites.

Reduced environmental footprint

Designed according to the standards of industrial excellence that the Group applies everywhere it operates, this site ensures production while minimising its consumption and environmental footprint. With zero carbon, thanks to the use of energy consumption control solutions, zero discharge of industrial liquids into the natural environment and an innovative copper recovery process, the Tangier plant exemplifies аÄÃÅÁùºÏ²Ê¿ª½±½á¹û's commitment to eco-responsibility.

аÄÃÅÁùºÏ²Ê¿ª½±½á¹û MOROCCO IN BRIEF

  • Surface area: 17,000m² in the Tangier free zone
  • Production capacity: 1.5 million kilometres of wires and cables
  • Technologies used: wire drawing, stranding, polymer processing, sheathing, electro-physical cross-linking
  • Investments: €19 million

See more

аÄÃÅÁùºÏ²Ê¿ª½±½á¹û
аÄÃÅÁùºÏ²Ê¿ª½±½á¹û wins the prestigious 2023 Technology and Innovation Award at the LEONI Supplier Summit, ranking among the top 100 suppliers for cabling systems.
аÄÃÅÁùºÏ²Ê¿ª½±½á¹û
аÄÃÅÁùºÏ²Ê¿ª½±½á¹û rises to the challenges of the electromobility and the ultra-connectivity !
аÄÃÅÁùºÏ²Ê¿ª½±½á¹û
аÄÃÅÁùºÏ²Ê¿ª½±½á¹û presents its new ranges at High voltage power cables with our E-layer technology®, Twinskin®, Datacables, developed and patented by аÄÃÅÁùºÏ²Ê¿ª½±½á¹û to build the spine of the powernet architecture inside electric and hybrid vehicles.